26 results
6-K
EX-99.1
ORLA
Orla Mining Ltd
29 Nov 22
Report of Foreign Private Issuer for the Month of November 2022
6:41pm
Standard inserted 170 pulp blanks, obtained from a supplier of CRMs, into the sample stream. The analyses of these revealed no significant issues … –2018, Gold Standard used certified pulp blanks obtained from a supplier of CRMs. Pulp blanks test for contamination during the analytical process
40-F
2021 FY
EX-99.1
ORLA
Orla Mining Ltd
18 Mar 22
Annual report (Canada)
9:18pm
, procurement, and construction management (“EPCM”) work. Updated cost information from firm supplier quotes, purchase orders issued, or committed costs … estimated by KCA with input from Orla; project metallurgical test work and process engineering; supplier quotes for reagents and fuel; recent KCA project
40-F
2021 FY
EX-99.3
ORLA
Orla Mining Ltd
18 Mar 22
Annual report (Canada)
9:18pm
of supplier substitution rights;
we have the right to obtain substantially all the economic benefits from the use of the asset throughout the period
6-K
EX-99.1
ORLA
Orla Mining Ltd
20 Jan 22
Updated NI 43-101 Technical Report on the Cerro Quema Project
4:27pm
Structural Steel
Platework
Mechanical Equipment
Solution Treatment Plants
Piping
Electrical
Instrumentation
Infrastructure & Buildings
Supplier Engineering … and overburden materials will not require drilling and blasting.
A contract explosives supplier will provide the blasting materials and technology
6-K
EX-99.2
ORLA
Orla Mining Ltd
7 Sep 21
Orla Mining Files Cerro Quema Oxide Project Pre-feasibility Study Technical Report
5:25pm
Plants
Piping
Electrical
Instrumentation
Infrastructure & Buildings
Supplier Engineering and Installation Supervision / Commissioning
Process Mobile … the rainy season. Topsoil and overburden materials will not require drilling and blasting.
A contract explosives supplier will provide the blasting
SUPPL
mia82uwnc61a9 j7hq
6 Jul 21
Supplemental materials (foreign)
6:02am
40-F
EX-99.2
467jvkb
22 Mar 21
Annual report (Canada)
12:00am
40-F
EX-99.3
a2k3 iln8yv42g
22 Mar 21
Annual report (Canada)
12:00am
40-F
EX-99.1
sjojt10lub
22 Mar 21
Annual report (Canada)
12:00am
F-10/A
gok lirnawzow1hf2v
12 Mar 21
Registration of securities (Canada) (amended)
4:28pm
6-K
EX-99.1
r5j6abkgwdmyiide ao
24 Feb 21
Current report (foreign)
1:33pm
F-10
hjolqagd6 od
10 Feb 21
Registration of securities (Canada)
4:48pm
6-K
EX-99.1
7auco1y frzxj6
9 Feb 21
NI 43-101 Technical Report on the Camino Rojo Gold Project
4:36pm
6-K
EX-99.1
5p0d7
21 Jan 21
Material Change Report Under National Instrument 51-102
2:43pm
6-K
EX-99.1
d93jl45irh3lyysg6a
11 Jan 21
Orla Mining Increases Gold Mineral Reserves by 54% With Updated Feasibility Study at the Camino Rojo Oxide Gold Project
5:07pm
40FR12B
EX-99.03
tbp 0jpcba9zn8cr96
4 Dec 20
Initial registration of securities (Canada)
5:28pm
40FR12B
EX-99.39
9upaplz5101ku9
4 Dec 20
Initial registration of securities (Canada)
5:28pm
40FR12B
EX-99.10
fdq0y9c
4 Dec 20
Initial registration of securities (Canada)
5:28pm
40FR12B
EX-99.48
m57rmtmiatp 3z8
4 Dec 20
Initial registration of securities (Canada)
5:28pm
40FR12B
EX-99.68
sl2hkij sq5ur
4 Dec 20
Initial registration of securities (Canada)
5:28pm